Series ended Other
Site Visit to the MUST-SIM NEES Equipment Site

About the series

The MUST-SIM facility is one of the 14 equipment sites that form the George E. Brown Network for Earthquake Engineering Simulation (NEES). This facility provides a total testing-analysis-visualization-display environment that combines the ability to test full-scale subassemblies under complex loading and boundary conditions.

Past events in this series

August 29–30, 2012, 8:00 a.m. – 4:00 a.m.